- Painting and Sandblasting
- Koch Nitrogen,
Fort Dodge, Iowa
- Pleasant Valley High
School,
Bettendorf, IA
- Alliance Pipeline
- Trinity Medical,
Center Moline, IL & Bettendorf, IA
- The iWireless Center,
Moline, IL
- Furniture Row,
Davenport, IA
 |
| |
|
|
| |
Join the list of satisfied customers that have put JCC
Painting & Sandblasting to the test. |
|
| |
|
|
 |
| |
|
|
| |
Equipped
with many years of experience and
all the specialized equipment they
could ever need, JCC tradesmen will
become your partners in a job that
satisfies your requirements for attractive
looks, functionality and cost.
When necessary, our crews have arrived within hours of a customer request and worked without stopping until job completion.
On routine painting and sandblasting assignments, our flexibility is also advantageous. Scheduled maintenance can be completed during evening hours, on weekends, or during pre-arranged plant shutdowns.
The N.A.C.E. Certified Coatings
Inspector we maintain on staff
at JCC (#5103) is a further
assurance of quality on jobs
where tolerances are critical.
Browse the galleries of completed projects. Then call to discuss your immediate or longer-term needs.
|
|
| |
|
|
| |
| Specialized
Painting and
Sandblasting Services: |
| |
 |
Dry
Ice Blasting (See
Video) |
 |
Plurel Component
Application |
 |
Application of
Tank Linings |
 |
Secondary Containment
Coatings |
| |
|
|
|
| |
 |
|
| |
|
|
| |
| Clean,
environmentally
friendly, Dry Ice
Blasting, (Play
Video) |
|
|
| |
|
|
|
 |
|
|
| |
|
|
| |
|
|
 |
| |
|
|
| |
Koch
Nitrogen, Fort Dodge, Iowa |
|
| |
|
|
 |
| |
|
|
| |
Helping
our customers keep
current with EPA standards
is a responsibility
that JCC painting and
sandblasting crews
take most seriously.
On this project, our
tradesmen carefully
removed lead paint,
primed and repainted
the company’s |
|
massive
nitrogen tank with
more than 300 gallons
of
high-quality polyurethane. In total, more than 2700 man-hours were invested,
many spent working far off the ground. |
|
| |
| |
| |
Project |
Lead
Abatement and repainting
137' x 98' tank |
| |
Customer |
Koch
Nitrogen |
| |
Dimensions |
138
x 98 |
| |
Material |
Sherwin
Williams Dura plate 235
- 850 gallons; High Solids
Polyuerthane - 305 gallons |
| |
Scope |
Remove
lead paint, prime, intermediate
ad top coat |
| |
Man Hours |
2.744 |
|
| |
|
|
| |
|
|
 |
| |
|
|
| |
Pleasant
Valley High School Swimming Pool, Bettendorf,
IA |
|
| |
|
|
 |
| |
|
|
| |
Working
on a tight schedule,
in close quarters,
on budget constrained
projects is nothing
out of the ordinary
for the Painting & Blasting
crews from JCC.
So it was that our
experienced personnel
were tasked to surface
prepare, seal and paint
the spacious PVHS swimming
facility in less than
240 |
|
man
hours and return it
to full school and
community access within
the short time window
provided.
On time. On budget. Expect nothing less from JCC. |
|
| |
| |
| |
Project |
Paint
and seal swimming pool |
| |
Customer |
Pleasant
Valley School
District |
| |
Dimensions |
1 area 75’x45” & the other area 45’x37’
Floor 5,040s/f Walls 2,682s/f Total = 7722s/f |
| |
Material |
105 gal. of Insl-X Pool Paint |
| |
Man Hours |
234 |
|
| |
|
|
| |
|
|
| |
|
|
 |
| |
|
|
| |
Alliance
Pipeline, location |
|
| |
|
|
 |
| |
|
|
| |
Protecting
components within
their challenging
environments is par
for the course at
JCC.
Blasting and protective
coating this valve
body and header pipe
while it remained underground
is just one recent
example of the specialized
skills
and equipment our engineers
and tradesmen can focus
on your most difficult
painting problems.
|
|
In
this case, it required
only 160 man hours
to ready Alliance’s
equipment for an anticipated
20 years of uninterrupted
service. |
|
| |
| |
| |
Project |
Alliance
Pipeline |
| |
Material |
Approximately
125 gallons of material |
| |
Scope |
Abrasive
blast and apply SPC-2888-RG
Plural Component 100%
solids material
to an underground Valve
Body and Header Pipe |
| |
Man
Hours |
160 |
| |
|
|
| |
|
| |
|
|
| |
|
|
| |
|
|
 |
| |
|
|
| |
Trinity
Medical Center, Moline, IL & Bettendorf,
IA |
|
| |
|
|
 |
| |
|
|
| |
While
the people of JCC take
great pride in our
work on each project,
the trust our customers
express through their
assignment of repeat
business is a great
source of satisfaction.
One recent example is the ability to follow our 1997 painting and wall-covering
applications at Trinity Medical Center, Moline, with a similar contract award
at Trinity’s Bettendorf, Iowa facility built in 2001. |
|
On average, more than 60 percent of JCC’s annual revenue can be traced to previous
business, a testimony to the trust and customer satisfaction we earn through
high quality service and cost-effective results. |
|
| |
| |
| |
Moline |
| |
|
|
| |
Project |
Trinity
Medical Center, 7th
Street, Campus |
| |
Customer |
Mortenson
Construction |
| |
Material |
N/A |
| |
Total
Weight |
11,000
yds wallcovering |
| |
Coatings |
3,200
gallons of paint |
| |
Man
Hours |
6,100 |
|
| |
Bettendorf |
| |
|
|
| |
Project |
Trinity
Medical Center, Terrace
Park Campus |
| |
Customer |
Mortenson
Construction |
| |
Material |
N/A |
| |
Total
Weight |
10,000
yds vynal wall
covering |
| |
Coatings |
3,500
gallons of paint |
| |
Man
Hours |
6,800 |
|
| |
|
|
| |
|
|
| |
|
|
 |
| |
|
|
| |
The
i wireless Center, Moline, IL |
|
| |
|
|
 |
| |
|
|
| |
This
civic center showplace
includes 2,500 lineal
yards of walls painted
by Johnson expert crews.
More than 7,000 gallons
of paint were used to
beautify and protect
the suraces for long-range
durability.
|
|
|
|
| |
| |
| |
Project |
The
i wireless Center |
| |
Customer |
Hubor,
Hunt & Nichols |
| |
Scope |
2,500
lineal yards |
| |
Material |
7,000
gallons of paint |
| |
Man Hours |
18,000 |
|
| |
|
|
| |
|
|
 |
| |
|
|
| |
Furniture Row, Davenport, IA |
|
| |
|
|
 |
| |
|
|
| |
Before
opening the doors on
a this creative retail
concept, this 4-stores-in-one
retail complex required
the consistent application
of quality paint throughout.
To speed the project
and minimize cleanup
expenses, JCC utilized
acrylic dryfall on
the ceilings and finished
the walls, window and
doorframes in
near record time. |
|
In
total, this extensive
painting job was accomplished
using two shifts per
day in just 1320 man
hours, helping General
Contractor General
One
Construction to deliver the building on time for the critically important fall
shopping season |
|
| |
| |
| |
Project |
Furniture Row |
| |
Customer |
Tower One Construction |
| |
Scope |
Paint
Interior – ceilings
and walls of Sofa Mart,
Denver Mattress,
Bedroom
Expressions, Oak Express |
| |
Material |
1267 gallons of Sherwin
Williams - Acrylic Dryfall
- ceilings;
Pro-Mar #200
latex - walls;
Pro-Mar
#200 alkyd - woodwork,
doors & frames, window
frames |
| |
Man Hours |
1320
man hours |
|
| |
|
|
| |
|
|
| |
|
|
|
|
|
 |
|